Practice Selection Guide
Name | Code | Brief Definition | Sheet & Rill Erosion | Rill & Gully Erosion | Streambank Erosion | Stream Channel Erosion | Toxics & Salt Reducion | Flooding | Increased Peak Flow | Nutrient Pollution | Pesticide Pollution | Sediment Damage | Dust Control | Construction Road Maintenance | Water Table Control | Organic Pollution |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Bioretention Facility | 800 | Constructed wetland to improve stormwater quality | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | |||||
Back Cut Curb | 801 | A temporary sediment trap formed by excavation behind the back of a curb, sidewalk or road edge | 2 | |||||||||||||
Cofferdam | 803 | Temporary structure in waterway or body of water to create a dry work area | 3 | |||||||||||||
Construction Road Stabilization | 806 | Stabilize temporary roads to reduce erosion | 3 | 2 | 2 | 3 | ||||||||||
Culvert Inlet Protection | 808 | Temporary sediment filter at culvert inlets | 2 | |||||||||||||
Dewatering | 813 | Removal of water from construction site | 1 | 1 | 1 | |||||||||||
Ditch Check Manufactured | 814 | Prefab, temporary dam or flow thru device installed across a ditch, swale, etc. to reduce velocity of water | 3 | 3 | ||||||||||||
Diversion | 815 | Channel and ridge constructed to collect and divert runoff | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
Diversion Dike | 820 | Perimeter dike to manage and divert runoff | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
Dust Control | 825 | Controlling dust on construction sites and roads | 1 | 1 | 3 | 1 | ||||||||||
Erosion Blanket | 830 | Pre-formed organic or inorganic erosion mat | 2 | 1 | 1 | 1 | 1 | 2 | 1 | |||||||
Erosion Blanket TRM | 831 | Pre-formed non-degradable erosion mat | 2 | 2 | 3 | 1 | 1 | 2 | 1 | |||||||
Filter Strip | 835 | Vegetated filter zone to remove pollutants | 2 | 1 | 1 | 1 | 2 | |||||||||
Grass-Lined Channels | 840 | Natural or constructed channel vegetated to convey water | 2 | 2 | 1 | 1 | 1 | 1 | 1 | |||||||
Infiltration Trench | 847 | Pits or trenches designed to hold water to increase infiltration | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||
Inlet Protection - Monofiliment Fabric B | 860 | Temporary practice to control sediment at storm drain inlet | 1 | 1 | 2 | |||||||||||
Inlet Protection - Impervious Surfaces | 861 | Temporary sediment control barrier for impervious surfaces | 1 | 1 | 1 | |||||||||||
Inlet Protection - Pervious Surfaces | 863 | Temporary sediment control barrier for pervious surfaces | 1 | 1 | 1 | |||||||||||
Land Grading | 865 | Smoothing surface to planned grade to improve site | 2 | 2 | 1 | 1 | 1 | 1 | 2 | |||||||
Level Spreader | 870 | Structure to spread water flow uniformly | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||
Lined Channel or Outlet | 872 | A constructed channel or outlet having an erosion resistant lining | 3 | 2 | ||||||||||||
Mulching | 875 | Placing materials to protect soil surface | 2 | 2 | 1 | 1 | 2 | 2 | 2 | 2 | ||||||
Open Channel | 878 | Construction of or improvement to a channel in which water flows | 2 | |||||||||||||
Permanent Vegetation | 880 | Establishing permanent vegetative cover | 3 | 3 | 2 | 2 | 2 | 2 | 3 | 3 | 3 | 3 | 1 | |||
Permeable Pavement | 890 | Pavement having interspersed sod, gravel, or sand areas | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||
Polyacrylamide (PAM) for Temporary Soil Stabilization | 893 | Agent to bind soil and prevent erosion | 3 | 1 | 3 | 3 | ||||||||||
Polyacrylamide (PAM) for Turbidity Reduction and Sediment Control | 894 | Agent to flocculate fine silts and clay in stormwater | 1 | 2 | 3 | |||||||||||
Portable Sediment Tank | 895 | Container for trapping sediment from runoff water | 1 | 1 | 2 | |||||||||||
Raingarden | 897 | Small, shallow depression to temporarily hold and infiltrate stormwater | 1 | 1 | ||||||||||||
Right-of-way Diversion | 900 | Structure to control roadway erosion | 1 | 1 | 1 | 2 | ||||||||||
Rock Check Dam | 905 | Structure to control erosion in ditch or grass swale | 3 | 2 | ||||||||||||
Rock Outlet Protection | 910 | Rocked area at outlets to reduce flow erosion | 2 | 2 | 2 | 1 | ||||||||||
Rolled Perimeter Control | 912 | Perimeter control for limited drainage areas | 1 | 1 | ||||||||||||
Sediment Forebay | 914 | A pool and settling basin constructed at an inlet to a stormwater management facility | 1 | 1 | 2 | 1 | ||||||||||
Silt Curtain | 917 | Temporary Sediment barrier of geosynthetic fabric in a water body | 2 | 1 | 1 | |||||||||||
Silt Fence | 920 | Temporary sediment barrier of filter fabric | 3 | 2 | 1 | 1 | ||||||||||
Sodding | 925 | Laying blanket of established turf to protect area | 3 | 3 | 2 | 1 | 2 | 2 | 3 | 3 | 3 | 3 | 1 | |||
Soil Stockpile Management | 927 | Temporary or permanent erosion control on a soil stockpile | 2 | 1 | ||||||||||||
Stabilized Construction Entrance | 930 | Rock pad at entrance or exit to control tracking of mud to streets | 1 | 3 | ||||||||||||
Structural Streambank Stabilization | 940 | Structure to control streambank erosion | 3 | 2 | ||||||||||||
Subsurface Drain | 945 | An underground water collection and transport tube | 1 | 1 | 2 | 2 | 1 | 2 | 1 | 1 | 1 | 2 | 3 | |||
Sump Pit | 950 | Temporary pit to trap and filter water | 2 | 2 | 2 | |||||||||||
Surface Roughening | 953 | Grooving, stair stepping, or tracking across a slope | 1 | 1 | 1 | 1 | ||||||||||
Temporary Concrete Washout | 954 | Management of solid and liquid wastes from concrete | 3 | 2 | ||||||||||||
Temporary Diversion | 955 | Temporary diversion for runoff control | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||
Temporary Sediment Trap | 960 | Temporary ponding basin to trap sediment | 1 | 1 | 1 | 1 | 2 | |||||||||
Temporary Seeding | 965 | Planting vegetation to protect areas from erosion | 3 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | ||||
Temporary Slope Drain | 970 | Short term water conveyance down a sloping area | 2 | 1 | 1 | 1 | 1 | |||||||||
Temporary Stream Crossing | 975 | Short term stream crossing for equipment | 1 | 1 | 2 | |||||||||||
Temporary Stream Diversion | 976 | Short term stream diversion to allow construcion in the dry | 1 | 3 | ||||||||||||
Temporary Swale | 980 | Temporary excavated drainageway to control runoff | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||
Topsoiling | 981 | Adding or replacing quality soil to the surface | 2 | 1 | 2 | 1 | 1 | 1 | 1 | 1 | ||||||
Tree/Forest Ecosystem Preservation | 984 | Protecting contiguous stands of trees from construction damage | 2 | 2 | 2 | 2 | 1 | 3 | 3 | 1 | 2 | 1 | ||||
Tree and Shrub Planting | 985 | Planting trees and shrubs | 3 | 3 | 3 | 2 | 1 | 2 | 3 | 3 | 3 | 3 | 2 | |||
Tree Protection | 990 | Protecting individual trees from construction damage | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||
Tree Protection-Augering | 991 | Protecting individual trees from underground construction damage | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||
Vegetative Streambank Stabilization | 995 | Vegetation to control streambank erosion | 3 | 1 | 1 | 1 | ||||||||||
Well Decommissioning | 996 | Permanent sealing of a water well, boring, or monitoring well | 3 | 3 | 3 | |||||||||||
Wetland Creation | 997 | Creation of a wetland in an area that did not historically contain a wetland | 2 | 1 | 2 | 1 | ||||||||||
Wetland Enhancement | 998 | Rehabilitate an existing wetland with focus on serving a specific function or purpose | 2 | 1 | 2 | 1 | ||||||||||
Wetland Restoration | 999 | Rehabilitate an existing wetland to approximate natural conditions (soils, hydrology, vegetation) | 2 | 1 | 2 | 1 |